What Happens After You Call Dispatch?

  1. Step 1 — Problem Intake: The caller describes the roofing problem (e.g. active drywall drip, storm shingle blow-off, metal roof seam leak) and property location.
  2. Step 2 — Contractor Availability Check: Dispatch determines whether a suitable independent provider has open capacity in your specific municipality.
  3. Step 3 — Direct Communication: The caller is informed about estimated timing, and the independent contractor contacts you directly to review on-site safety, scope, and pricing.